Manufacturing Processes (name some) CNC milling, CNC turning, Precision Grinding,  EDM Machining, Profile Extrusion, Casting, Forging, Laser Cutting, Bending, Welding, Surface Finish, etc
Materials (name some) Aluminum AL6061, AL6063,AL7075,AL5052, etc
Stainless Steel S.S.303, S.S.304, S.S.316, S.S.316L, etc.
Steel Mild steel, Carbon steel, 4140, 4340, Q235, Q345B, 20#, 45# etc
Iron 1213, 12L14,1215 etc.
Brass C36000 ( C26800), C37700 ( HPb60), C38500( HPb58), C27200(CuZn37) , C28000(CuZn40), etc
Bronze C51000, C52100, C54400, etc.
Plastic Acrylic, Nylon, PEEK, POM, ABS, PC, etc.
Surface Finish (name some) anodizing, chemical film, oxide, zinc-plated, nickel-plated, chrome-plated, silver-plated, gold-plated, Teflon coating, powder coating, PVD coating, heat treatment, passivation, sandblasting, brushing, polishing,  etc
Tolerance(name some): 1. CNC Turning tolerance: +/-0.01mm
2. CNC Milling Tolerance: +/-0.01mm
3. WEDM tolerance: +/-0.01mm
4. EDM Mirror tolerance: +/-0.005mm
5. Precision Grinding: +/-0.005mm
Drawing Format PDF / DWG / IGS / STEP / STP / X_T
Packing Wood case or carton, 1, With plastic bag and pearl-bubble bag. 2, To be packed in cartons or wood cases. 3 Use adhesive tape to seal cartons or nail screws to tighten the wood case. Different packing methods will be chosen according to different projects to ensure safe shipping.
Shipping 1) 0-100kg: by express or by air as priority. It takes 3 to 5 days by express, like DHL, UPS, and FedEx. And 7 to 15 days by air.
2) >100kg: by sea as a priority. It takes 25 to 40 days.
MOQ 1PCS
Trade Terms EXW, FOB, CIF, As per customer’s request
Payment Terms PayPal or T/T
Lead Time 3 to 5 days for top urgent prototypes, and it finally depends on order quantity and complexity.                                For general projects, lead time is 10 to 20 days.